Saturday 24 February 2007

Gunung Ledang 24-25 Feb 2007




On 24 February 2007 joined 15 hikers to scale Gunung Ledang via the Sagil trail (from Tangkak). We camped at CP5 Sungei Segitiga (666m) and trekked up the summit (1267m) the following morning to catch the sunrise and return home on the same day. A very challenging trek with lots of ladders and ropes along a very interesting scenic trail…a worthwhile trip.

For photographs, please refer to http://happytrekker.shutterfly.com/pictures/78.

Sunday 11 February 2007

Gunung Angsi 11 Feb 2007




Arrived at the head trail along the road to Ulu Bendul. Trekked up from 200m elevation to 845m elevation. Time taken was 2 hours.

For the photographs, please refer to http://happytrekker.shutterfly.com/pictures/293.

Sunday 4 February 2007

Sg Chiling Waterfall 4 Feb 2007




Decided to chill out at Sg Chilling waterfall given the long spell of hot weather. Trek time taken was only an hour to the Lower Fall and another 5 minutes to the Upper Fall. Noted that changing facilities and a bridge for the first river crossing were being built. No rubbish in sight and the area was well maintained.


For the photographs, please refer to http://happytrekker.shutterfly.com/pictures/159.

Thursday 1 February 2007

Kem Pacat (aka Leech Camp) 1 Feb 2007




We started at 9 a.m. from the base Resort (200m) and arrived at Kem Lolo (555m) 2 hours later, at 11 a.m. After lunch and having rested enough we made an impromptu decision to trek to Kem Pacat (1045m). We started off 1 p.m. and arrived at 2.30 p.m. after trekking for 11/2 hours. We proceeded our downhill trek at 3.00 p.m. and arrived at Kem Lolo at 4.00 p.m. After a feast of fruit, we trekked back to the Base Resort at 4.25 p.m. and arrived at 5.50 p.m. (11/2 hrs). A very satisfying trek... the weather was favourable and the trail was dry.


For the photographs, please refer to http://happytrekker.shutterfly.com/pictures/20.